{"id":34126,"date":"2026-08-14T14:54:20","date_gmt":"2026-08-14T12:54:20","guid":{"rendered":"https:\/\/francortesarquitectos.com\/?page_id=34126"},"modified":"2026-10-05T16:05:11","modified_gmt":"2026-10-05T16:05:11","slug":"declaracion-de-obra-nueva","status":"publish","type":"page","link":"https:\/\/francortesarquitectos.com\/en\/guides\/declaracion-de-obra-nueva\/","title":{"rendered":"Declaraci\u00f3n de obra nueva: the deed that makes your house exist"},"content":{"rendered":"\n<div class=\"wp-block-group fcg\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n\n\n<style>\n.fcg{\n  --surface:#fcfcfb; --ink:#1A1A1A; --ink2:#52514e; --muted:#66625A;\n  --grid:#e1e0d9; --axis:#c3c2b7; --ring:rgba(11,11,11,0.10); --band:#EBE7E1;\n  --c1:#1A1A1A; --c2:#eb6834; --c3:#1baf7a;\n  color-scheme:light;\n}\n.fcg .fcg-caja{background:var(--surface); border:1px solid var(--ring);\n  border-left:3px solid var(--c1); border-radius:8px; padding:16px 18px; margin:24px 0}\n.fcg .fcg-caja p{margin:0; line-height:1.6}\n.fcg .fcg-caja p + p{margin-top:10px}\n.fcg .fcg-nota{background:var(--band); border-left:3px solid var(--c2);\n  border-radius:7px; padding:15px 17px; margin:24px 0}\n.fcg .fcg-nota p{margin:0; font-size:14.5px; line-height:1.6}\n.fcg .fcg-nota p + p{margin-top:9px}\n.fcg .fcg-nota.ok{border-left-color:var(--c3)}\n\n\/* cifras destacadas *\/\n.fcg .fcg-datos{display:grid; grid-template-columns:repeat(3,1fr); gap:10px; margin:22px 0 26px}\n.fcg .fcg-datos.dos{grid-template-columns:repeat(2,1fr)}\n.fcg .fcg-dato{background:var(--surface); border:1px solid var(--ring); border-radius:9px;\n  padding:14px 15px; border-top:3px solid var(--tono,var(--c1))}\n.fcg .fcg-dato .v{font-size:23px; font-weight:660; letter-spacing:-.028em; line-height:1.1;\n  color:var(--ink); font-variant-numeric:tabular-nums}\n.fcg .fcg-dato .k{font-size:12.5px; color:var(--ink2); margin-top:6px; line-height:1.45}\n\n\/* tarjetas *\/\n.fcg .fcg-cards{display:grid; grid-template-columns:repeat(3,1fr); gap:12px; margin:20px 0 26px}\n.fcg .fcg-cards.dos{grid-template-columns:repeat(2,1fr)}\n.fcg .fcg-card{background:var(--surface); border:1px solid var(--ring); border-radius:10px;\n  padding:17px 18px; border-top:3px solid var(--tono,var(--c1))}\n.fcg .fcg-card .cab{font-size:12px; text-transform:uppercase; letter-spacing:.09em;\n  font-weight:650; color:var(--muted); margin-bottom:8px}\n.fcg .fcg-card h3{font-size:16px; margin:0 0 10px; font-weight:650; letter-spacing:-.012em}\n.fcg .fcg-card p{font-size:13.5px; line-height:1.6; color:var(--ink2); margin:0 0 9px}\n.fcg .fcg-card p:last-child{margin-bottom:0}\n\n\/* pasos numerados *\/\n.fcg .fcg-pasos{counter-reset:paso; margin:20px 0 26px; padding:0; list-style:none}\n.fcg .fcg-pasos li{counter-increment:paso; position:relative; padding:0 0 18px 46px;\n  border-left:1px solid var(--grid); margin-left:15px}\n.fcg .fcg-pasos li:last-child{border-left-color:transparent; padding-bottom:0}\n.fcg .fcg-pasos li::before{content:counter(paso); position:absolute; left:-15px; top:-2px;\n  width:30px; height:30px; border-radius:50%; background:var(--ink); color:#fff;\n  font-size:13px; font-weight:660; display:flex; align-items:center; justify-content:center}\n.fcg .fcg-pasos h3{font-size:16.5px; margin:2px 0 6px; font-weight:650; letter-spacing:-.012em}\n.fcg .fcg-pasos p{font-size:14.5px; line-height:1.62; margin:0 0 8px; color:var(--ink2)}\n.fcg .fcg-pasos p:last-child{margin-bottom:0}\n.fcg .fcg-pasos a{font-weight:600}\n\n\/* tabla *\/\n.fcg .wp-block-table table{border-collapse:collapse; font-size:14px; width:100%}\n.fcg .wp-block-table th{text-align:left; font-size:12px; text-transform:uppercase;\n  letter-spacing:.07em; color:var(--muted); font-weight:650;\n  border-bottom:1px solid var(--axis); padding:9px 10px 8px}\n.fcg .wp-block-table td{border-bottom:1px solid var(--grid); padding:11px 10px;\n  vertical-align:top; line-height:1.5}\n.fcg .wp-block-table tr:hover td{background:var(--band)}\n.fcg .wp-block-table .num{font-variant-numeric:tabular-nums; white-space:nowrap; font-weight:620}\n\n\/* comprobaci\u00f3n *\/\n.fcg .fcg-check{list-style:none; padding:0; margin:18px 0 26px;\n  display:grid; grid-template-columns:repeat(2,1fr); gap:1px 22px}\n.fcg .fcg-check li{position:relative; padding:8px 0 8px 25px; font-size:14px;\n  line-height:1.5; border-bottom:1px solid var(--grid)}\n.fcg .fcg-check li::before{content:\"\"; position:absolute; left:3px; top:.82em; width:9px;\n  height:5px; border-left:2px solid var(--c3); border-bottom:2px solid var(--c3);\n  transform:rotate(-45deg)}\n.fcg .fcg-check.no li::before{border:0; width:11px; height:2px; background:var(--c2);\n  transform:none; top:1.08em}\n\n\/* preguntas *\/\n.fcg .fcg-faq{display:grid; grid-template-columns:repeat(2,1fr); gap:12px; margin:20px 0 8px}\n.fcg .fcg-faq .q{background:var(--surface); border:1px solid var(--ring);\n  border-radius:9px; padding:16px 17px}\n.fcg .fcg-faq h3{font-size:14.5px; margin:0 0 8px; font-weight:650; line-height:1.38}\n.fcg .fcg-faq p{font-size:13.5px; line-height:1.6; color:var(--ink2); margin:0}\n\n\/* cierre *\/\n.fcg .fcg-cta{background:var(--ink); color:#fff; border-radius:11px;\n  padding:26px 28px; margin:32px 0 8px}\n.fcg .fcg-cta h2{color:#fff; font-size:20px; margin:0 0 11px; font-weight:650;\n  letter-spacing:-.018em; line-height:1.28}\n.fcg .fcg-cta p{color:rgba(255,255,255,.80); font-size:14.5px; line-height:1.62; margin:0 0 10px}\n.fcg .fcg-cta .btns{display:flex; gap:10px; flex-wrap:wrap; margin-top:18px}\n.fcg .fcg-cta a{display:inline-block; padding:11px 20px; border-radius:6px; font-size:14.5px;\n  font-weight:600; text-decoration:none; border:1px solid transparent}\n.fcg .fcg-cta a.p{background:#fff; color:var(--ink)}\n.fcg .fcg-cta a.s{border-color:rgba(255,255,255,.34); color:#fff}\n.fcg .fcg-cta a:hover{opacity:.86}\n\n\/* fuentes *\/\n.fcg .fcg-fuentes{font-size:12.5px; color:var(--muted); line-height:1.6;\n  border-top:1px solid var(--grid); padding-top:14px; margin-top:30px}\n.fcg .fcg-fuentes strong{color:var(--ink2)}\n\n@media(max-width:781px){\n  .fcg .fcg-cards, .fcg .fcg-cards.dos, .fcg .fcg-faq,\n  .fcg .fcg-check, .fcg .fcg-datos, .fcg .fcg-datos.dos{grid-template-columns:1fr}\n  .fcg .fcg-cta{padding:21px}\n}\n<\/style>\n\n\n\n<div class=\"fcg-caja\"><p>The <em>declaraci\u00f3n de obra nueva<\/em> (declaration of new building) is the deed by which you record that there is a house on your property. Until it is executed and registered, as far as the Land Registry (<em>Registro de la Propiedad<\/em>) is concerned <strong>you still own a bare plot<\/strong>: the house cannot be mortgaged or sold with legal certainty.<\/p><p>It is governed by <strong>article 28 of Royal Legislative Decree 7\/2015<\/strong>. In the Madrid region the tax is <strong>0.75 %<\/strong> and it is worked out on the cost of the works, not on the value of the house or the land.<\/p><\/div>\n\n\n<h2 class=\"wp-block-heading\">Three routes, not one<\/h2>\n\n\n<div class=\"fcg-cards\"><div class=\"fcg-card\" style=\"--tono:#1A1A1A\"><div class=\"cab\">During the works<\/div><h3>Under construction<\/h3><p>The works are declared as designed, not yet built. This requires the permit and a technician\u2019s certificate of conformity with the design.<\/p><p>The usual route when there is a self-build mortgage: the bank wants the future building already tied to the property.<\/p><\/div><div class=\"fcg-card\" style=\"--tono:#1baf7a\"><div class=\"cab\">On completion<\/div><h3>Completed<\/h3><p>It also requires the certificate of completion (<em>certificado final de obra<\/em>), evidence of the requirements for delivery to users, the document authorising occupancy and the energy performance certificate.<\/p><p>If the building under construction was already registered, completion is recorded afterwards.<\/p><\/div><div class=\"fcg-card\" style=\"--tono:#eb6834\"><div class=\"cab\">Without a permit<\/div><h3>By age<\/h3><p>The exceptional route of article 28.4, when legality can no longer be restored by lapse of time. No permit and no completion certificate.<\/p><p>In Madrid: six years as a general rule, fifteen on protected non-developable land.<\/p><\/div><\/div>\n\n\n<h2 class=\"wp-block-heading\">What the notary and the land registrar require<\/h2>\n\n<p class=\"wp-block-paragraph\">The same things. Article 28.1 imposes them on notaries and article 28.2 on land registrars before they register. For a <strong>completed<\/strong>:<\/p>\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Document<\/th><th>Rule<\/th><\/tr><\/thead><tbody><tr><td>Building permit<\/td><td>Art. 152.b Law 9\/2001 (Madrid)<\/td><\/tr><tr><td><strong>Certificate of completion<\/strong> from a competent technician<\/td><td>Art. 28.1 TRLSRU; art. 12.3.e LOE<\/td><\/tr><tr><td><strong>Declaration of compliance (<em>declaraci\u00f3n responsable<\/em>) for first occupancy<\/strong> (in Madrid no longer a licence)<\/td><td>Art. 155.c Law 9\/2001; art. 28.1.b TRLSRU<\/td><\/tr><tr><td><strong><em>Libro del edificio<\/em><\/strong> (building manual), for filing at the Registry<\/td><td>Art. 202 LH<\/td><\/tr><tr><td><strong>Ten-year insurance (<em>seguro decenal<\/em>)<\/strong> or the self-build exemption<\/td><td>Arts. 19.1.c and 20.1 LOE; second additional provision<\/td><\/tr><tr><td>Energy performance certificate for the completed building<\/td><td>Art. 28.1.b TRLSRU; RD 390\/2021<\/td><\/tr><tr><td><strong>Georeferenced coordinates<\/strong> of the footprint occupied<\/td><td>Art. 202 LH<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<div class=\"fcg-nota\"><p><strong>The coordinates surprise a lot of people.<\/strong> Since the 2015 reform, the land occupied by the building has to be identified by its geographic reference coordinates. This is not a step the notary handles: it comes out of the technical work, and it is worth planning for.<\/p><\/div>\n\n\n<h2 class=\"wp-block-heading\">The ten-year insurance and the ten-year trap<\/h2>\n\n<p class=\"wp-block-paragraph\">The second additional provision of the LOE exempts the <strong>individual self-builder (<em>autopromotor<\/em>) of a single detached house for their own use<\/strong>. So far, the good news. The small print says that if the house is transferred between living persons within ten years, the self-builder <em>\u201cunless otherwise agreed, shall be obliged to take out the cover for the remaining period\u201d<\/em>.<\/p>\n\n<p class=\"wp-block-paragraph\">And the closing words are blunt: <em>\u201cpublic deeds of inter vivos transfer shall not be authorised or registered at the Land Registry without evidence and a record of the said cover having been constituted, unless the self-builder, who must show that they have used the dwelling, is expressly released by the acquirer\u201d<\/em>.<\/p>\n\n\n<ul class=\"fcg-check\"><li>The exemption holds while the house is for your own use<\/li><li>The ten years run from the <strong>reception<\/strong> of the works<\/li><li>Saying you have lived there is not enough: it has to be <strong>evidenced<\/strong><\/li><li>The release has to be <strong>express<\/strong> by the buyer<\/li><li>It applies to a transfer in lieu of payment as well<\/li><li>Inheritance is not covered: the rule speaks of transfers between the living<\/li><\/ul>\n\n\n<h2 class=\"wp-block-heading\">What it costs<\/h2>\n\n<h3 class=\"wp-block-heading\">The tax: stamp duty (<em>actos jur\u00eddicos documentados<\/em>)<\/h3>\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Item<\/th><th>In the Madrid region<\/th><\/tr><\/thead><tbody><tr><td>Rate<\/td><td><span class=\"num\">0.75 %<\/span><\/td><\/tr><tr><td>Taxable base<\/td><td>The <strong>real cost value of the new building<\/strong> declared. Not the market value. <strong>The land is not included<\/strong><\/td><\/tr><tr><td>Filing deadline<\/td><td>30 business days from execution of the deed, form 600<\/td><\/tr><tr><td>Example<\/td><td>Declared cost of \u20ac300,000 \u2192 <span class=\"num\">\u20ac2,250<\/span><\/td><\/tr><\/tbody><\/table><\/figure>\n\n<h3 class=\"wp-block-heading\">Notary and Land Registry<\/h3>\n\n<p class=\"wp-block-paragraph\">The fee scales date from 1989 and are set in bands, with a general reduction of 5 %. For a declared value of \u20ac300,000, the basic scale comes to around \u20ac388 for the notary and \u20ac205 for the registry, <strong>before<\/strong> pages, copies, disbursements and VAT. The final invoice is appreciably higher and depends on how long the deed runs.<\/p>\n\n\n<div class=\"fcg-nota\"><p><strong>Why we do not give a closed range.<\/strong> We have checked the scales and the reduction, but not a total invoice range with a source we trust. We would rather say so than invent a figure that fails to add up later.<\/p><\/div>\n\n\n<h2 class=\"wp-block-heading\">The order everything goes in<\/h2>\n\n\n<ol class=\"fcg-pasos\"><li><h3>Certificate of completion<\/h3><p>Signed by the architect and the building engineer (<em>aparejador<\/em>), with <em>visado<\/em> (professional association approval stamp).<\/p><\/li><li><h3>Energy performance certificate<\/h3><p>For the completed building, registered with the Madrid region.<\/p><\/li><li><h3><em>Libro del edificio<\/em><\/h3><p>Handed over by the architect directing the works and deposited at the town hall, which in Madrid is a condition for first occupancy.<\/p><\/li><li><h3>Declaration of compliance for first occupancy<\/h3><p>At the town hall. It is worth also asking for the certificate of conformity (<em>acto de conformidad<\/em>).<\/p><\/li><li><h3>Deed of the completed new building<\/h3><p>Before a notary, with all the documentation above.<\/p><\/li><li><h3>Tax<\/h3><p>Form 600, within 30 business days.<\/p><\/li><li><h3>Registration<\/h3><p>No legal deadline, but the entry of presentation lasts 60 business days.<\/p><\/li><li><h3>Catastro and utilities<\/h3><p>Form 900D and permanent supply contracts.<\/p><\/li><\/ol>\n\n\n<h2 class=\"wp-block-heading\">What happens if it is never declared<\/h2>\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Effect<\/th><th>Why<\/th><\/tr><\/thead><tbody><tr><td>The house does not appear at the Registry: the property is still a plot<\/td><td>Art. 202 LH<\/td><\/tr><tr><td>The house cannot be mortgaged or sold with legal certainty<\/td><td>The bank requires the property registered with the building<\/td><\/tr><tr><td>A mismatch with the <em>Catastro<\/em>, possibly a file opened<\/td><td>Consolidated Cadastral Act<\/td><\/tr><tr><td>No registry protection against third parties or registered attachments<\/td><td>Arts. 32 and 34 LH<\/td><\/tr><tr><td>The tax does not become time-barred: it falls due on the deed, not on building<\/td><td>Art. 31.2 of the consolidated act on the tax<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p class=\"wp-block-paragraph\">And do not confuse the lapse of planning enforcement with legalisation: the time limits running out prevents demolition, but the building is left non-conforming (<em>fuera de ordenaci\u00f3n<\/em>), with a marginal note at the Registry.<\/p>\n\n<h2 class=\"wp-block-heading\">Frequently asked questions<\/h2>\n\n\n<div class=\"fcg-faq\"><div class=\"q\"><h3>Do I need ten-year insurance if I build my own house?<\/h3><p>No, not if you are the individual self-builder of a single detached house for your own use: the second additional provision of the LOE exempts you. But if you sell within ten years you must take it out for the time remaining, unless the buyer expressly releases you and you can show you have used the house.<\/p><\/div><div class=\"q\"><h3>What value do I pay the tax on?<\/h3><p>On the real cost of carrying out the works as declared, not on the market value and without including the land. Article 70.1 of the tax regulations says so. In the Madrid region the stamp duty (<em>actos jur\u00eddicos documentados<\/em>) rate is 0.75 %.<\/p><\/div><div class=\"q\"><h3>Can I execute the deed without first occupancy?<\/h3><p>In Madrid, yes, by producing the declaration of compliance and showing that the period has passed without an obstructive decision, under article 28.1.b of the Land Act. Even so, it is worth also obtaining the town hall\u2019s certificate of conformity, because registry practice is demanding.<\/p><\/div><div class=\"q\"><h3>Is the libro del edificio compulsory in order to register?<\/h3><p>Yes. Since November 2015, article 202 of the Mortgage Act (<em>Ley Hipotecaria<\/em>) has required it to be produced for filing at the Registry, and the Directorate General has ruled that this applies to detached houses and to self-build too.<\/p><\/div><div class=\"q\"><h3>I built years ago without a permit. Can I register it?<\/h3><p>You may be able to, by the route in article 28.4 of the Land Act, if planning legality can no longer be restored. In the Madrid region the period is six years as a general rule and fifteen on protected non-developable land. You have to evidence the date of completion and that there is no planning enforcement note.<\/p><\/div><div class=\"q\"><h3>One deed or two?<\/h3><p>It depends on the financing. With a self-build mortgage, the bank usually requires the building under construction to be registered before it releases funds, and completion is recorded afterwards. With no mortgage, the deed of the completed new building is executed directly.<\/p><\/div><\/div>\n\n\n\n<div class=\"fcg-cta\"><h2>We prepare all the technical documentation for the deed<\/h2><p>Certificate of completion, energy performance certificate, <em>libro del edificio<\/em> and georeferenced coordinates. Coordinated with first occupancy, which is what usually holds up the signing at the notary\u2019s.<\/p><div class=\"btns\"><a class=\"p\" href=\"https:\/\/francortesarquitectos.com\/en\/contact\/\">Talk to the studio<\/a><a class=\"s\" href=\"https:\/\/francortesarquitectos.com\/en\/tools\/construction-cost\/\">Work out what my house will cost<\/a><\/div><\/div>\n\n\n\n<div class=\"fcg-fuentes\"><strong>Sources.<\/strong> Royal Legislative Decree 7\/2015, consolidated Land and Urban Regeneration Act, article 28. Mortgage Act (<em>Ley Hipotecaria<\/em>), articles 9.a, 32, 34 and 202. Law 38\/1999, articles 7, 17, 19, 20.1 and second additional provision. Law 9\/2001 on Land of the Madrid region, articles 152, 155 and 195. Royal Legislative Decree 1\/1993 and Royal Decree 828\/1995, articles 70.1 and 102.1. Legislative Decree 1\/2010 of the Madrid region, article 36. Royal Decrees 1426\/1989 and 1427\/1989 on fee scales, with the reduction in the eighth additional provision of Royal Decree-law 8\/2010. Royal Decree 390\/2021.<\/div>\n\n\n<\/div><\/div>\n\n\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Do I need ten-year insurance if I build my own house?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No, not if you are the individual self-builder of a single detached house for your own use: the second additional provision of the LOE exempts you. But if you sell within ten years you must take it out for the time remaining, unless the buyer expressly releases you and you can show you have used the house.\"}},{\"@type\":\"Question\",\"name\":\"What value do I pay the tax on?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"On the real cost of carrying out the works as declared, not on the market value and without including the land. Article 70.1 of the tax regulations says so. In the Madrid region the stamp duty (actos jur\u00eddicos documentados) rate is 0.75 %.\"}},{\"@type\":\"Question\",\"name\":\"Can I execute the deed without first occupancy?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In Madrid, yes, by producing the declaration of compliance and showing that the period has passed without an obstructive decision, under article 28.1.b of the Land Act. Even so, it is worth also obtaining the town hall\u2019s certificate of conformity, because registry practice is demanding.\"}},{\"@type\":\"Question\",\"name\":\"Is the libro del edificio compulsory in order to register?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Since November 2015, article 202 of the Mortgage Act (Ley Hipotecaria) has required it to be produced for filing at the Registry, and the Directorate General has ruled that this applies to detached houses and to self-build too.\"}},{\"@type\":\"Question\",\"name\":\"I built years ago without a permit. Can I register it?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"You may be able to, by the route in article 28.4 of the Land Act, if planning legality can no longer be restored. In the Madrid region the period is six years as a general rule and fifteen on protected non-developable land. You have to evidence the date of completion and that there is no planning enforcement note.\"}},{\"@type\":\"Question\",\"name\":\"One deed or two?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It depends on the financing. With a self-build mortgage, the bank usually requires the building under construction to be registered before it releases funds, and completion is recorded afterwards. With no mortgage, the deed of the completed new building is executed directly.\"}}]}<\/script>\n","protected":false},"excerpt":{"rendered":"<p>What the notary requires to execute the deed of a completed new building, what the land registrar asks for and how much tax you pay in the Madrid region.<\/p>\n","protected":false},"author":5,"featured_media":0,"parent":34116,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rank_math_title":"Declaraci\u00f3n de obra nueva: documents, tax, registration","rank_math_description":"What a Spanish notario needs in order to execute the deed of a finished house, what the registrar asks for and what the tax costs in the Comunidad de Madrid.","rank_math_focus_keyword":"declaracion de obra nueva spain","rank_math_canonical_url":"","rank_math_robots":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_facebook_image":"","rank_math_twitter_use_facebook":"","footnotes":""},"class_list":["post-34126","page","type-page","status-publish","hentry"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/34126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=34126"}],"version-history":[{"count":3,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/34126\/revisions"}],"predecessor-version":[{"id":38225,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/34126\/revisions\/38225"}],"up":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/34116"}],"wp:attachment":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=34126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}