{"id":38626,"date":"2026-11-09T15:53:34","date_gmt":"2026-11-09T14:53:34","guid":{"rendered":"https:\/\/francortesarquitectos.com\/?page_id=38626"},"modified":"2026-11-11T17:54:33","modified_gmt":"2026-11-11T16:54:33","slug":"how-to-choose-a-builder-in-marbella","status":"publish","type":"page","link":"https:\/\/francortesarquitectos.com\/en\/guides\/how-to-choose-a-builder-in-marbella\/","title":{"rendered":"How to choose a builder in Marbella"},"content":{"rendered":"\n<p>Choosing the builder is the decision that most affects the cost, the quality and the stress of building a villa in Marbella. We are architects, not a construction company. We prepare the project, help you find builders, compare their quotes line by line, go with you to the meetings and site visits, and tell you what we see. The choice is yours. This guide explains what to check before you sign.<\/p>\n\n<h2>What a builder has to do under Spanish law<\/h2>\n<p>The Building Act (Ley 38\/1999, de Ordenaci\u00f3n de la Edificaci\u00f3n, LOE) defines the builder as the party who commits, under contract with the owner, to carry out the works according to the project and the contract (article 11). Among its legal duties:<\/p>\n<ul>\n<li>Build following the project, the applicable rules and the instructions of the site architect and the building engineer.<\/li>\n<li>Appoint a site manager (jefe de obra) with the right qualifications for the size of the job.<\/li>\n<li>Subcontract only within the limits set in the contract.<\/li>\n<li>Sign the setting-out record at the start (acta de replanteo) and the handover record at the end (acta de recepci\u00f3n).<\/li>\n<\/ul>\n<p>A builder who cannot explain who the site manager will be, or who wants to start before the setting-out record is signed, is already telling you something.<\/p>\n\n<h2>Checks before you sign<\/h2>\n<h3>Registration as a construction company<\/h3>\n<p>Any company hired to work on a construction site in Spain has to be registered in the Registry of Accredited Companies (Registro de Empresas Acreditadas, REA). The law requires it for main contractors and subcontractors alike (Ley 32\/2006, article 4.2), and the registry data are public (article 6.2). Ask for the registration number and check it. Ask the same for the main subcontractors.<\/p>\n\n<h3>The building licence<\/h3>\n<p>In Andalusia, building works need a prior licence from the town hall, except the minor works that can go by responsible declaration (Ley 7\/2021, LISTA, articles 137 and 138). A new villa needs the licence before work starts. A builder who offers to start without it is putting your house at risk, not saving you time.<\/p>\n\n<h3>Guarantees<\/h3>\n<p>The LOE sets three guarantees for new homes (article 19.1):<\/p>\n<ul>\n<li><strong>One year<\/strong> for finishing defects. It can be insurance or a 5 % retention of the construction cost kept by the owner.<\/li>\n<li><strong>Three years<\/strong> for defects that affect habitability.<\/li>\n<li><strong>Ten years<\/strong> for structural damage: the decennial insurance.<\/li>\n<\/ul>\n<p>Only the ten-year insurance is compulsory for homes today (additional provision two). The other two can be made compulsory by royal decree, but that has not happened yet. That is why the one-year cover should be written into the contract, usually as the 5 % retention until the year has passed. An individual who builds a single house for their own use does not need the decennial insurance, unless the house is sold within ten years.<\/p>\n\n<h2>How to compare quotes<\/h2>\n<p>Two quotes are only comparable if they price the same thing. A price per square metre is not a quote.<\/p>\n<ul>\n<li><strong>Same bill of quantities.<\/strong> Every builder should price the measurements of the project, line by line. We send the same document to all of them.<\/li>\n<li><strong>What is left out.<\/strong> Look for lump sums (partidas alzadas), &#8220;provisional&#8221; items and exclusions: landscaping, pool equipment, connections to the networks, waste management or the crane.<\/li>\n<li><strong>Payment schedule.<\/strong> Payments should follow the progress certified by the site management, not fixed dates.<\/li>\n<li><strong>Time and penalties.<\/strong> A completion date without a penalty clause is a wish.<\/li>\n<li><strong>VAT.<\/strong> Building a home under a contract signed directly between the owner and the builder pays the reduced 10 % rate (Ley 37\/1992, article 91.Uno.3.1.\u00ba). Check that the quote applies it correctly.<\/li>\n<\/ul>\n\n<h2>Warning signs<\/h2>\n<ul>\n<li>A large advance payment before any work is done.<\/li>\n<li>No REA number, or no written contract.<\/li>\n<li>&#8220;We can start now and sort out the licence later.&#8221;<\/li>\n<li>A quote much lower than the rest with no explanation of what it leaves out.<\/li>\n<li>Pressure to sign quickly or to change the project to fit the price.<\/li>\n<\/ul>\n\n<h2>How we help you choose<\/h2>\n<p>We prepare the execution project with full measurements, so every builder prices the same house. We help you find builders, and we can introduce some we have worked with, serious and reliable companies. We compare the offers line by line, go to the meetings and the site visits with you, and give you our view of which one fits your house best. You decide. Once the works start, we direct them on your side, independent from the builder.<\/p>\n<p>If you want to see how we work on a whole project, read our page on <a href=\"https:\/\/francortesarquitectos.com\/en\/turnkey-projects\/\">turnkey projects<\/a> or the one about our <a href=\"https:\/\/francortesarquitectos.com\/en\/architect-in-marbella\/\">architect service in Marbella<\/a>.<\/p>\n\n<h2>Frequently asked questions<\/h2>\n<h3>Can the architect choose the builder for me?<\/h3>\n<p>We never choose for you. We compare, explain the differences and say which offer we think is best for your house. The contract is between you and the builder.<\/p>\n<h3>Is it better to hire a builder who also does the design?<\/h3>\n<p>It can be simpler, but then nobody checks the builder on your side. With an independent architect, the person who certifies the works is not the one who builds them.<\/p>\n<h3>What should the contract include?<\/h3>\n<p>The project documents, the priced bill of quantities, the payment schedule linked to certified progress, the completion date and the penalty, the one-year retention and the handover procedure.<\/p>\n\n<p><small>Sources consulted on 9 November 2026: Ley 38\/1999, de Ordenaci\u00f3n de la Edificaci\u00f3n, articles 11, 17 and 19 and additional provision two (BOE, consolidated text); Ley 32\/2006, reguladora de la subcontrataci\u00f3n en el sector de la construcci\u00f3n, articles 4 and 6 (BOE); Ley 37\/1992, del IVA, article 91 (BOE); Ley 7\/2021, de impulso para la sostenibilidad del territorio de Andaluc\u00eda, articles 137 and 138.<\/small><\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>Choosing the builder is the decision that most affects the cost, the quality and the stress of building a villa in Marbella. We are architects, not a construction company. We prepare the project, help you find builders, compare their quotes line by line, go with you to the meetings and site visits, and tell you [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"parent":34116,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"rank_math_title":"How to choose a builder in Marbella | Fran Cort\u00e9s","rank_math_description":"What to check before signing with a builder in Marbella: registration, licence, guarantees, how to compare quotes and the warning signs.","rank_math_focus_keyword":"builders marbella","rank_math_canonical_url":"","rank_math_robots":"","rank_math_facebook_title":"","rank_math_facebook_description":"","rank_math_facebook_image":"","rank_math_twitter_use_facebook":"","footnotes":""},"class_list":["post-38626","page","type-page","status-publish","hentry"],"permalink_manager":null,"_links":{"self":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/38626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/comments?post=38626"}],"version-history":[{"count":1,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/38626\/revisions"}],"predecessor-version":[{"id":38636,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/38626\/revisions\/38636"}],"up":[{"embeddable":true,"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/pages\/34116"}],"wp:attachment":[{"href":"https:\/\/francortesarquitectos.com\/en\/wp-json\/wp\/v2\/media?parent=38626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}