Health and safety study
We write the full or basic health and safety study required for the project. What it is and when you need one.

Services · Health and safety on site
Health and safety coordination during the works and the health and safety study for the project, in the Madrid region and on the Costa del Sol (Málaga).
Health and safety
We act as coordinador de seguridad y salud (health and safety coordinator) on works for detached houses, extensions, full renovations and buildings, and we write the health and safety study that goes with the project. We do this in the Madrid region and on the Costa del Sol (Málaga).
Fran Cortés, a building engineer (arquitecto técnico) registered with the COAATM under no. 105,287, signs the coordination, and the studio team visits the site in person. We can take it on by itself or together with the dirección de ejecución (works supervision by the building engineer).
Royal Decree 1627/1997
Article 9 of Royal Decree 1627/1997 sets out what the coordinator must do during the works:
Where no coordinator is required, approving the plan and controlling access fall to the site management team (dirección facultativa).
What we do
We write the full or basic health and safety study required for the project. What it is and when you need one.
We review the health and safety plan written by the builder and approve it before the works begin.
We coordinate the companies and self-employed workers on site at the same time, so that prevention is actually applied.
We keep the incident book, which must always be on site, and record anything that needs correcting.
The law
Royal Decree 1627/1997 requires the developer to appoint a health and safety coordinator during the works as soon as more than one company, or a company and self-employed workers, or several self-employed workers, are involved (article 3). On a house, that is almost always the case.
The same royal decree requires every project to include a health and safety study, or a basic study for smaller works (article 4). The full study is compulsory when the construction budget reaches €450,759.08 (75 million pesetas), when the works last more than 30 working days with more than 20 workers at once, or when they add up to more than 500 worker-days.
The health and safety plan is written by the builder and approved by the coordinator before the works start (article 7).
Source consulted on 4 October 2026: Royal Decree 1627/1997 (BOE).
Without a project
Yes, on the same terms as works with a project. Article 3.2 of Royal Decree 1627/1997 requires the client to appoint a coordinator as soon as more than one company, or a company and self-employed workers, or several self-employed workers, work on site. It does not depend on there being a project. This often happens in interior renovations processed through a responsible declaration.
What changes is the paperwork. According to the criteria approved by Spain's National Commission for Safety and Health at Work in December 2013:
Spain's National Institute for Safety and Health at Work (INSST) explains how the decree applies, with and without a project, in its technical guide on construction site risks (in Spanish).
Sources consulted on 8 November 2026: Royal Decree 1627/1997 (BOE), Articles 2, 3, 7 and 9 · CNSST, application of RD 1627/97 to works without a project (12 December 2013).
How we work
Step 1
At the design stage, we write the full or basic health and safety study.
Step 2
We review the builder's health and safety plan, ask for anything missing and approve it.
Step 3
We check the protective measures on site and coordinate the companies working at the same time.
Step 4
If the works change, we approve the amendments to the plan until the works are finished.
Frequently asked questions
Can’t see your question? Write to us and we will reply the same day.
Ask on WhatsAppIf more than one company, or a company and self-employed workers, are involved, yes. On a house that is the norm: structure, building services and finishes are usually different companies.
The developer, that is, the owner who commissions the works. They must appoint one before the works start or as soon as the situation arises.
The study goes with the project and is written by a qualified professional. The plan is written by the builder, adapting the study to how they work, and approved by the coordinator.
Yes. It is common for the building engineer (aparejador) to take on the coordination too. See building engineer (aparejador and arquitecto técnico).
Yes, on any works where more than one company or self-employed worker is involved.
It depends on the length and size of the works. We give you a fixed price after seeing the project.
No. The decree states that appointing coordinators does not release the client from their responsibilities (Article 3.4). The coordinator organises prevention on site with technical judgement.
The site management team. If only one company works on site, with no self-employed workers, and no coordinator is needed, the builder still writes the plan and the site management team approves it before work starts (Article 7.2).
Yes. The coordinator is part of the site management team (Article 2.1.f), and the role can be taken on, for example, by the building engineer (arquitecto técnico) in charge of construction management. At our practice Fran Cortés signs it as arquitecto técnico, on its own or together with construction management.
It is not compulsory. The incident book is linked to the health and safety plan, and works without a project have no plan. Coordination is recorded using the procedures of Royal Decree 171/2004, according to the National Commission for Safety and Health at Work.
Where we work most
We take on this kind of work in the Madrid region and in the province of Málaga (Marbella and the Costa del Sol).
Let’s talk
Tell us about your project. Call or write to us and we will give you an initial assessment, with no obligation.