Services · Health and safety on site

Health and safety coordinator in Madrid

Health and safety coordination during the works and the health and safety study for the project, in the Madrid region and on the Costa del Sol (Málaga).

Health and safety

A safe, compliant site

We act as coordinador de seguridad y salud (health and safety coordinator) on works for detached houses, extensions, full renovations and buildings, and we write the health and safety study that goes with the project. We do this in the Madrid region and on the Costa del Sol (Málaga).

Fran Cortés, a building engineer (arquitecto técnico) registered with the COAATM under no. 105,287, signs the coordination, and the studio team visits the site in person. We can take it on by itself or together with the dirección de ejecución (works supervision by the building engineer).

Royal Decree 1627/1997

Duties of the health and safety coordinator

Article 9 of Royal Decree 1627/1997 sets out what the coordinator must do during the works:

  • Coordinate the principles of prevention when the works are planned and the length of each phase is decided.
  • Coordinate contractors, subcontractors and self-employed workers so that they apply those principles consistently.
  • Approve the contractor's health and safety plan and every change to it.
  • Organise coordination between the companies working on site.
  • Check that working methods are applied correctly.
  • Take the necessary steps so that only authorised people enter the site.

Where no coordinator is required, approving the plan and controlling access fall to the site management team (dirección facultativa).

What we do

What we do on every project

Approving the plan

We review the health and safety plan written by the builder and approve it before the works begin.

Coordination on site

We coordinate the companies and self-employed workers on site at the same time, so that prevention is actually applied.

Incident book

We keep the incident book, which must always be on site, and record anything that needs correcting.

The law

When is a health and safety coordinator required?

Royal Decree 1627/1997 requires the developer to appoint a health and safety coordinator during the works as soon as more than one company, or a company and self-employed workers, or several self-employed workers, are involved (article 3). On a house, that is almost always the case.

The same royal decree requires every project to include a health and safety study, or a basic study for smaller works (article 4). The full study is compulsory when the construction budget reaches €450,759.08 (75 million pesetas), when the works last more than 30 working days with more than 20 workers at once, or when they add up to more than 500 worker-days.

The health and safety plan is written by the builder and approved by the coordinator before the works start (article 7).

Source consulted on 4 October 2026: Royal Decree 1627/1997 (BOE).

Without a project

Works without a project: is a coordinator needed?

Yes, on the same terms as works with a project. Article 3.2 of Royal Decree 1627/1997 requires the client to appoint a coordinator as soon as more than one company, or a company and self-employed workers, or several self-employed workers, work on site. It does not depend on there being a project. This often happens in interior renovations processed through a responsible declaration.

What changes is the paperwork. According to the criteria approved by Spain's National Commission for Safety and Health at Work in December 2013:

  • There is no health and safety study or plan. Instead, each contractor provides its own risk assessment for that site and the prevention planning that follows from it.
  • A site incident book is not compulsory. Coordination is recorded with the means set out in Royal Decree 171/2004 on coordination of business activities.
  • The notice of opening of the workplace is filed with the risk assessment, as there is no plan (Order TIN/1071/2010).

Spain's National Institute for Safety and Health at Work (INSST) explains how the decree applies, with and without a project, in its technical guide on construction site risks (in Spanish).

Sources consulted on 8 November 2026: Royal Decree 1627/1997 (BOE), Articles 2, 3, 7 and 9 · CNSST, application of RD 1627/97 to works without a project (12 December 2013).

How we work

From the project to the end of the works

Step 1

Health and safety study

At the design stage, we write the full or basic health and safety study.

Step 2

The builder's plan

We review the builder's health and safety plan, ask for anything missing and approve it.

Step 3

Site visits

We check the protective measures on site and coordinate the companies working at the same time.

Step 4

Changes and close-out

If the works change, we approve the amendments to the plan until the works are finished.

Frequently asked questions

Questions about health and safety

Can’t see your question? Write to us and we will reply the same day.

Ask on WhatsApp
Is a coordinator compulsory for the works on my house?

If more than one company, or a company and self-employed workers, are involved, yes. On a house that is the norm: structure, building services and finishes are usually different companies.

Who appoints the coordinator?

The developer, that is, the owner who commissions the works. They must appoint one before the works start or as soon as the situation arises.

What is the difference between the study and the health and safety plan?

The study goes with the project and is written by a qualified professional. The plan is written by the builder, adapting the study to how they work, and approved by the coordinator.

Can you be coordinator and building engineer at the same time?

Yes. It is common for the building engineer (aparejador) to take on the coordination too. See building engineer (aparejador and arquitecto técnico).

Do you do this on renovations and extensions?

Yes, on any works where more than one company or self-employed worker is involved.

How much does it cost?

It depends on the length and size of the works. We give you a fixed price after seeing the project.

If I appoint a coordinator, am I no longer responsible as the client?

No. The decree states that appointing coordinators does not release the client from their responsibilities (Article 3.4). The coordinator organises prevention on site with technical judgement.

Who approves the safety plan if there is no coordinator?

The site management team. If only one company works on site, with no self-employed workers, and no coordinator is needed, the builder still writes the plan and the site management team approves it before work starts (Article 7.2).

Can the coordinator be the same professional who manages the works?

Yes. The coordinator is part of the site management team (Article 2.1.f), and the role can be taken on, for example, by the building engineer (arquitecto técnico) in charge of construction management. At our practice Fran Cortés signs it as arquitecto técnico, on its own or together with construction management.

Is a site incident book needed for works without a project?

It is not compulsory. The incident book is linked to the health and safety plan, and works without a project have no plan. Coordination is recorded using the procedures of Royal Decree 171/2004, according to the National Commission for Safety and Health at Work.

Reviews

What our clients say on Google

Our clients rate us 5.0 out of 5 on Google.

Read their reviews

Where we work most

Health and safety in the Madrid region and the province of Málaga

We take on this kind of work in the Madrid region and in the province of Málaga (Marbella and the Costa del Sol).

Let’s talk

Do you need a health and safety coordinator?

Tell us about your project. Call or write to us and we will give you an initial assessment, with no obligation.