Fran Cortés
Arquitectos
Plot prepared for the start of works on a house

Guides

Guides to building your house in Madrid

The paperwork and documents for a self-build, explained one by one by the studio that signs them, with the regulations behind each one and what really happens in Madrid.

What this is

What hardly anyone explains until it holds you up

Building your own house means many months of decisions and a long list of documents. Here they are explained one by one, with the regulations behind them and with what really happens at Madrid’s town halls, which is not always what the internet says.

They are written by the studio that signs those documents. If we have not been able to confirm something in the regulations, we say so instead of filling the gap.

And to run the numbers, use the studio’s tools: the construction cost calculator and the fees calculator.

To take away

Three free PDF guides (in Spanish)

18 months: what happens in each one

The timeline of a bespoke detached house, month by month: what happens, what you decide and how much of your time it takes. 29 pages. Download the guide (PDF, in Spanish)

How much it costs to build your house

A 150 m² house broken down item by item, taxes included, from the land to the contingency reserve. 9 pages. Download the guide (PDF, in Spanish)

Where to start

Before buying or drawing

How to become a self-builder

The ten steps, from the plot to the Land Registry, with the regulations for each step. Read the guide

What you can build on your plot

Setbacks, buildable area, site coverage, height and countable floor area. Read the guide

Self-build mortgage

How the money is released stage by stage and which document unlocks each one. Read the guide

How much it costs to build your house

Works, technical team, your town hall’s taxes, site works and contingencies. Use the calculator

Permit and works

To apply for the permit and start the works

ICIO and permit fee

What you pay, and how much, in 30 Madrid municipalities, with their local bylaws. Read the guide

Health and safety study

When the basic study is enough, and why a house almost always needs a coordinator. Read the guide

Setting-out record

What the law requires on a private project and what is just custom. Read the guide

On completion

So your house legally exists

Final completion certificate

Who signs it, why it gets the professional association approval stamp (visado) and what it sets in motion. Read the guide

Building logbook

What it contains, who signs it and why it is different in Madrid. Read the guide

First occupancy licence

In Madrid it is now a declaration of compliance (declaración responsable): documents, fees and timescales. Read the guide

Declaration of new building

What the notary and the land registrar ask for, and the taxes in the Madrid region. Read the guide

Frequently asked questions

Questions about the guides

Can’t see your question? Write to us and we will reply the same day.

Ask on WhatsApp
Are the guides useful outside Madrid?

The national law parts, yes. What changes from one municipality to another (taxes, permits, local bylaws) is explained for the Madrid region. We work throughout Spain; if your plot is elsewhere, ask us.

How often are they updated?

Whenever the regulations change. Each guide shows the date it was reviewed and the official sources it uses.

Reviews

What our clients say on Google

Our clients rate us 5.0 out of 5 on Google.

Read their reviews

Let’s talk

Would you rather go through it together?

Tell us about your project. Call or write to us and we will give you an initial assessment, with no obligation.