How much does it cost to build a turnkey house in Spain?

Find out how much it costs to build a turnkey house in Spain, what a turnkey contract includes and the factors that affect the cost.

Fran CortésFran Cortés, architect
6 February 2026 · updated 4 November 2026 · 6 min read
How much it costs to build a turnkey house in Spain

At Fran Cortés Arquitectos we explain the cost of a turnkey house as the sum of several items, from the design to the handover of the keys, including the coordination of every trade and all the paperwork.

Turnkey construction refers to a process in which a single company takes responsibility for everything: project, permits, works, finishes and even managing suppliers.

What exactly does a turnkey new build include?

what exactly a turnkey house includes

When you commission a house on a turnkey basis, the idea is simple: the company takes care of everything so that all you have to do is collect the keys and move in. In general terms, this type of contract usually includes:

  • Complete architectural design (drawings, project report, technical documentation).
  • Handling permits and paperwork with the town hall.
  • Management and coordination of the works.
  • Supply and installation of systems: plumbing, electrics, heating and cooling.
  • Interior and exterior finishes (cladding, windows and doors, flooring).
  • Quality control and partial handovers during the works.

This approach takes away the stress of keeping track of many suppliers and avoids surprises caused by delays or overlapping responsibilities.

How much does a turnkey house cost?

A turnkey house is not cheaper or more expensive by definition: the house costs what its construction, its professionals and its taxes cost. What changes is who coordinates it and who checks the quality.

Based on the figures we work with in the studio:

  • The construction of a designer home with medium-high specifications costs between €1,500 and €1,800/m² built.
  • The real cost, once you add VAT, the technical team, town hall taxes, site works and contingencies, ends up 35 % to 50 % above the construction price. And that is without the plot.
  • The technical team (basic design, construction drawings, site supervision and works supervision, with health and safety coordination included) starts from €24,000 at our studio. Each case is studied and given a fixed price.

Be wary of “turnkey” prices per square metre that look very low: they usually leave out special foundations, utility connections, site works on the plot, the permit or taxes, which then turn up later. We explain it item by item in how much it costs to build a house, and you can run your own numbers with the construction cost calculator.

What about a turnkey prefabricated house?

The construction system changes the build time and some cost items, but not the taxes, the site works or the need for a project, a permit and site supervision. We explain it in turnkey prefabricated house (in Spanish).

Turnkey: who builds and who checks

Turnkey: who builds and who checks

Every house involves two roles. One is whoever builds it: the builder or, for a prefabricated house, the factory. The other is whoever checks it is built properly: the professional supervision team (dirección facultativa), that is, the architect and the building engineer (aparejador). The supervision team is your house’s quality control.

In many turnkey houses, the same company does both: it builds and provides its own architect. It looks convenient, but that architect is paid by the builder. It is like letting the student mark their own exam.

An example: during the works a crack appears, or a measurement does not match the project. Someone has to make the builder fix it at their own cost. If that someone works for the builder, the claim loses its force. An independent architect only defends you.

What can happen if the architect works for the builder

  • Your house is adapted to what suits them to build, not to what is best for you and your plot.
  • Extras that were not in the price: foundations, utility connections, the permit or site works are often left out and turn up later.
  • Defects nobody claims for: the person who should demand a repair works for the company that has to carry it out.
  • A certificate of completion without real control: the person signing that the works are fine depends on the company that did them.

Our turnkey service: we take care of everything, but on your side

We take care of everything: the project, the permit, choosing the builder or manufacturer and site supervision. The difference is that we do not work for the builder or the factory: we work for you.

  • We ask several builders or manufacturers for quotes and compare them item by item.
  • We help you choose the best one for your house.
  • We check what each offer includes and what it leaves out, before you sign.
  • We supervise the works and only sign the certificate of completion when the house is as designed.

And we move quickly on our side: a first proposal in drawings and realistic images in 10–15 days, the basic design in 6–8 weeks to apply for the permit, and the construction drawings while the town hall processes it. So when the permit arrives, we are already negotiating with builders. If you are interested in an industrialised house, see how we work with precast concrete houses.

The law also separates these roles: the Building Act (Ley de Ordenación de la Edificación, LOE) distinguishes the builder (article 11), who carries out the works, from the site supervisor (article 12) and the works supervisor (article 13), who control them.

We work anywhere in Spain, mostly in the Madrid region and on the Costa del Sol (Málaga). Book your free 30-minute consultation with the architect and tell us about your house.

How we do it, in turnkey architects.

Frequently asked questions

1. What does a turnkey house mean?

It is a contract and delivery model in which a single company takes responsibility for designing, coordinating, building and handing over the finished home, ready to move into, without the client having to coordinate different suppliers.

2. Does the turnkey price include the land?

No. The cost of the plot, the taxes on buying the land and some administrative costs are not usually included in the turnkey price. The price normally covers only the building and its complete construction.

3. Is it more expensive than contracting by phases?

Not necessarily. Although it may look more expensive in some cases, having a single point of responsibility and tighter budget control can offset the coordination fees, avoiding cost overruns caused by communication or planning errors.

4. How long does turnkey construction take?

It depends on the complexity of the project and the construction method, but with traditional construction in Spain a detached house can take between 10 and 12 months from the start of works to handover. The permit period can add extra weeks or months.

5. What options are there if I want to adjust the budget for a turnkey house?

We can optimise costs through the design (floor area, solar orientation, energy efficiency), the choice of materials and the construction system (for example, prefabricated or a traditional structure).

Let’s talk

Planning to build a house or renovate the one you have?

Tell us about your project. Call or write to us and we will give you an initial assessment, with no obligation.