If you are thinking of building a house, one of the first questions is usually: how much does an architect charge to design a house? At Fran Cortés Arquitectos, a studio specialising in house design and new-build projects for traditional and precast concrete homes, we hear this question a lot.
The short answer is: it depends. The long answer, and the important one, is that an architect’s fees vary with the type of project, the complexity of the design, the construction budget and the scope of the services you hire.
In this article we explain clearly how much it can cost to hire an architect to build a house from scratch (in Spanish), what their fees normally include and what affects the final price.
What do an architect’s fees include?

When looking at how much an architect charges to design a house, it is important to understand which services are included. It is not just “drawing plans”. Normally, the full brief to build a house from scratch includes:
1. Basic design (proyecto básico)
This defines the overall design of the house, the layout, regulatory compliance and planning matters. It is the document you need to apply for the building permit (licencia de obra).
2. Construction drawings (proyecto de ejecución)
These develop every construction detail technically: structure, building services, construction systems, quantities and an itemised budget. This is where the design becomes something that can actually be built.
3. Site supervision (dirección de obra)
The site supervising architect (in Spanish) oversees the works and checks that construction follows the approved project and current regulations.
4. Coordination with other professionals
Building a detached house also involves the building engineer (arquitecto técnico) for works supervision (dirección de ejecución), the health and safety coordinator, the geotechnical engineer and others. In many cases, our studio manages the whole team so the client does not have to worry.
Factors that affect how much an architect charges to design a house
No two homes are the same. The fees will depend on several factors:
1. Size of the house
Building a small house of 120 m² is not the same as a 400 m² detached house. The larger the floor area, the more technical work there is.
2. Complexity of the design
A simple design, with a regular geometry and standard construction solutions, takes fewer hours to develop than a house with complex volumes, large structural cantilevers or one-off finishes.
3. Location and regulations
Planning and technical requirements vary by region and municipality. Ground conditions also play a part: steep slopes, difficult soils or protected areas add complexity.
4. Level of customisation
If you want a fully bespoke design, with a detailed orientation study, advanced energy efficiency or landscape integration, the process goes deeper. In our case, house design is always bespoke, which means thorough creative and technical work.
5. Scope of the brief
Some clients hire the project only. Others choose a full service, including works management, choosing the builder, cost control and comprehensive advice throughout the works.
Price breakdown: designing the house vs. supervising the works
When someone asks how much an architect charges to design a house, they are really mixing two different questions: how much does it cost to design my house? And how much does it cost to supervise its construction?
Both stages are compulsory and are priced separately, so it is worth understanding each one before asking for a quote.
An architect’s work on a new build is usually structured as three technical commissions, contracted one after the other, which together make up their total fees.
Watch out when comparing quotes: as well as the architect, the law requires a works supervisor (building engineer, arquitecto técnico or aparejador) and, almost always, a health and safety coordinator. If a quote only covers one stage, you will still have to pay for the others. In our studio, because Fran Cortés is both an architect and a building engineer, the four compulsory phases come in a single commission: basic design, construction drawings, site supervision and works supervision, with health and safety coordination included.
1. Price of the basic design (the design)
The basic design is the first technical document to be drawn up: it defines the layout, the volumes, regulatory compliance and the planning aspects of the house. It is the document submitted to the town hall (Ayuntamiento) to apply for the building permit.
Its cost depends on the size of the house, the plot and what the town hall requires. That is why it makes no sense to give a standalone price per phase: each case has to be studied.
In this article you can find out in detail how much a building permit for a house costs (in Spanish).
2. Price of the construction drawings (the technical side)
Once the permit has been granted, the construction drawings are developed: the complete technical document with the structural calculations, building services, quantities and an itemised budget. It is, in essence, the “instruction manual” that guides the builder throughout the works.
This is the phase with the most technical work: structure, services and quantities. Like the basic design, its cost depends on each house.
3. Fees for site supervision (the construction stage)
Site supervision is the service in which the architect oversees, visits and certifies that construction is carried out in line with the approved project and current regulations. It is a legal requirement and lasts as long as the works.
How we do it: we do not price phase by phase. We study each case and give you a fixed price in writing for the four compulsory phases together (basic design, construction drawings, site supervision and works supervision), with health and safety coordination included. You pay by milestones, never in advance.
Architects’ prices by type of project
Not every commission is the same: designing and building a house from scratch does not have the same technical cost as renovating an existing one. The regulatory complexity, the level of intervention and the amount of documentation vary considerably between the two.
Project cost for a new build
In a new build, the architect has to develop the full cycle: basic design, construction drawings and site supervision, plus the preliminary studies and health and safety coordination.
There is no official percentage for an architect’s fees in Spain: each studio sets its own. At our studio, a new-build house project with its four phases (basic design, construction drawings, site supervision and construction management, with health and safety coordination included) starts at €24,000 plus VAT. We give you a fixed quote for the fees once we have seen the house and the plot.
Remember that on top of these fees come those of the building engineer (aparejador), the geotechnical survey (in Spanish), the permit and other costs we detail later in this article.
How much does an architect charge for a renovation project?
Renovating an existing home is technically simpler than starting from scratch, and that is reflected in the fees. The architect does not need to design how the building sits on the plot or work out every construction system from scratch: they start from an existing building and transform it.
As a general rule, fees for a renovation project are usually lower than for a new build, because you start from a house that already exists. In addition, minor or interior renovations may not need such intensive site supervision, which lowers the total cost further.
In our article on fees for renovation projects you will find all the details and practical examples.
So, how much does an architect charge to design a house in Spain?

In general terms, there is no official scale: an architect’s fees for a detached house in Spain depend on the size of the house, how complex it is and what the project includes. Ask for a written quote that lists every phase, so you can compare like with like.
These figures are neither fixed nor official, as there have been no compulsory fee scales for years. Each architecture studio sets its fees according to its experience, method and scope of service.
What if you only need the drawings for a house?
If you are not ready to build yet and just need the drawings for your future home, the cost and scope of the commission change.
In this article, How much does an architect charge for a plan in Spain?, we explain in detail what types of drawings exist, what they cost and when it is enough to hire only this service without a full project.
Is a new-build architect more expensive in Madrid?
Building in the Madrid region (Comunidad de Madrid) or in the capital has particular features that can make the process more expensive than the national average. The cost of land, longer administrative timescales and higher demand for quality projects mean Madrid studios tend to charge more than studios in other regions.
On top of that come the City of Madrid’s municipal fees for processing planning permits, which are calculated on the PEM and can add several thousand euros.
If your plot is in a metropolitan-area municipality such as Pozuelo, Las Rozas or Boadilla, prices are similar to those in the capital, although each town hall has its own permit fees that are worth checking before budgeting.
How much does it cost to build a house on top of the fees?
When looking at how much an architect charges to design a house, many people also ask about the total cost of the process.
As a guide, based on our studio’s experience, the construction cost of a new detached house with medium-high specifications is €1,500–1,800/m² built, excluding VAT. On top of this you need to add:
- Project and technical supervision
- Geotechnical survey
- Topographical survey
- Building permit
- Quality control
- Health and safety coordination
- Utility connections and site works
- Notary and land registry fees
We explain it in detail in this article: How much does it cost to build a house in Spain?
Is it expensive to hire an architect to build a house?

This is an interesting point when asking how much an architect charges to design a house. At first sight, the fees may seem high. However, the architect is not an optional extra: they define the project that will shape 100% of the spending that follows.
A good project makes the most of resources, improves energy efficiency, reduces unexpected issues and avoids construction mistakes that can cost far more than the fees themselves. In other words, the architect does not make the works more expensive; they help keep them under control.
How much does an architect charge to design a small house?
For a small house, the fees may be a slightly higher percentage of the total budget, because there are minimum costs for the technical work that do not depend on size.
For example, a 100–120 m² house may have fees similar in percentage to a larger one, even if they are lower in absolute terms.
This is because the level of technical responsibility is the same regardless of floor area.
Can the price be negotiated?
Yes, but always within reason. Rather than negotiating a straight discount, it is better to adjust the scope of the service.
For example:
- Limiting works management.
- Reducing certain additional services.
- Setting separate work phases.
What matters is that the contract is clear and that both sides have aligned expectations from the start.
Your house, with the architect from the first sketch

If you are thinking of building a house, whether a traditional detached house or a precast concrete house, working with a specialist architecture studio makes the difference between a stressful experience and a well-managed process.
At Fran Cortés Arquitectos we design your detached house, help you choose a builder and supervise the works independently of the builder, from the first sketch to the certificate of completion. We work anywhere in Spain, mostly in the Madrid region and on the Costa del Sol (Málaga).
If you want to know how much an architect charges for a turnkey house in Spain, get in touch and ask for a tailored quote that fits the needs of your project.
If you want to see exactly what our commission includes, you can find it on architect for bespoke detached houses.
Frequently asked questions
1. Is it compulsory to hire an architect to build a house?
Yes. For any new-build house (in Spanish), you must have an architect to draw up the project and supervise the works.
2. Do the fees include the building engineer?
Not usually. The building engineer (works supervision) usually invoices separately, although many studios, ours included, coordinate the whole team. In this article we explain in detail how much it costs to hire an aparejador (in Spanish).
3. When are the fees paid?
They are usually split by phase: one part when the commission is signed, another when the basic design is delivered, another with the construction drawings and the rest during site supervision.
4. How long does an architect take to develop the project?
For a detached house, the project can take between 3 and 6 months, depending on its complexity and the client review times.
5. Is it different for a prefabricated house?
For industrialised or precast concrete homes, the technical process is different, but you still need a project adapted to the plot and to local regulations.




