A well-run renovation starts long before the first team of workers arrives. The design is what turns an idea (“I want to knock down this partition wall and change the kitchen”) into works with a permit, comparable quotes and clear timescales. We explain how it is done, step by step, and which mistakes to avoid.
Does your renovation need a design?
It depends on what you change. If the renovation substantially alters the structure, façade, volume or use of the building, the law requires a design signed by an architect and a building permit (licencia de obra) from the town hall. Interior renovations that do not affect the structure usually go through a declaration of compliance (declaración responsable), sometimes with a technical report. We explain it in declaration of compliance for works in Madrid.
Even when it is not compulsory, a design with drawings and measurements is the only way to ask for quotes that can actually be compared.
Step 1. Visit and condition of the property
We check the structure, the services, any damp, and what can and cannot be changed. In a flat, we also look at the communal elements and what the residents’ association allows. This is the step that avoids the most surprises.
Step 2. Your needs and total budget
What you want to achieve (more light, a different layout, an extra bathroom, better insulation) and how much you want to invest in total, not just in the works: VAT, design, town hall and interior design. You will find the cost items in how much it costs to renovate a house.
Step 3. Layout proposal
We show you the new layout in drawings and realistic images, and refine it with you until it is finalised.
Step 4. Basic design and construction drawings
The proyecto básico (basic design) and proyecto de ejecución (construction drawings) are the documents used to obtain the permit and to carry out the works: drawings, written specification, structural calculations if the structure is affected, services, measurements and budget, and a health and safety study where required. For a flat, the design is usually ready in 2–4 weeks.
Step 5. Permit or declaration of compliance
We handle the application with the town hall. You will find what the town hall charges (the construction tax, ICIO, and in some municipalities a fee) by municipality in the guide to the ICIO and the building permit.
Step 6. Choosing the builder
We ask several builders for quotes based on the same design, compare them item by item and help you choose the one that best suits your renovation. Interior design is by Monfrank Deco, our sister interior design studio.
Step 7. Site supervision and handover
We supervise the works independently of the builder: we check that they are carried out according to the design, review the stage certificates before they are paid and sign the completion certificate when everything is as designed.
Common mistakes
- Starting without knowing which authorisation you need. A declaration of compliance does not cover works that needed a permit.
- Comparing quotes that are not comparable. Without a design, each builder prices a different job.
- Forgetting the services. They are what you do not see, and what you are most glad to have replaced.
- Not setting money aside for contingencies. You cannot see what is behind a partition wall until you open it up.
How we do it at the studio
Fran Cortés is an architect (COAM no. 21.503) and a building engineer (arquitecto técnico, COAATM no. 105.287), and signs off projects with a team of architects and building engineers. The studio produces the basic design and construction drawings for your renovation, which is what the permit is obtained with; the works are carried out by the builder that best suits the job, and the interior design by Monfrank Deco. The full service is described in full renovations in Madrid, and what the design costs in how much an architect charges for a renovation design.
We carry out this kind of work in the Madrid region and in the province of Málaga (Marbella and the Costa del Sol).
Book your free 30-minute consultation with the architect.
If your flat is in a listed building, as is the case in much of Chamberí, the Salamanca district or Retiro, the permit has its own rules. We explain them on each district’s page.
Frequently asked questions
What is a renovation design?
The technical document that defines the renovation (drawings, written specification, measurements and budget), used to apply for the permit and to carry out the works.
How long does a renovation design take?
For a flat, 2 to 4 weeks. For a detached house, it depends on what is being renovated. The permit depends on the town hall.
Can I renovate without a design?
If the renovation does not affect the structure, façade, volume or use, a declaration of compliance may be enough. Even so, without drawings and measurements it is hard to compare quotes and keep control of the works.