Condition of the building
We visit the home and check the structure, the services, and what can and cannot be changed.

Services · Renovations
The basic design and construction drawings for your whole-house renovation, which secure the permit; the builder that best suits the job; and interior design by Monfrank Deco. In the Madrid region and on the Costa del Sol (Málaga).
Whole-house renovations
We design whole-house renovations of detached houses, flats and homes: new layouts, façade changes, new services or energy efficiency upgrades. The first step is to find out what the building and the regulations allow, so the renovation does not get stuck at the town hall.
In the Madrid region and the province of Málaga we take on renovations of any size. Elsewhere in Spain we handle large full renovations, with the studio acting as project manager of the works from start to finish.
The studio prepares the proyecto básico y de ejecución (basic design and construction drawings) that secure the permit, and helps you choose the builder that best suits your renovation. Interior design is by Monfrank Deco, our sister interior design studio, so the design and the interiors are coordinated from the start.
If the renovation improves insulation, windows or services, once it is finished we issue your energy performance certificate with the new rating.
In the city of Madrid every neighbourhood has its own rules and building types. We explain them for Chamberí, the Salamanca district, Retiro and Arganzuela.
What we do
We visit the home and check the structure, the services, and what can and cannot be changed.
We design the new layout and show it to you in drawings and realistic images before applying for the permit.
We handle whatever your town hall requires, so the works start fully in order.
We help you choose the builder that best suits your renovation, and the interior design is by Monfrank Deco.
Studio renovations
A loft with very little floor area that needed reorganising to make the most of it. We removed partition walls and separated the rooms with glass panels and with the furniture itself: the space became open, with natural light in every area and storage planned down to the centimetre.
The aim was twofold: every square metre had to earn its place and, despite the small size, the home had to be comfortable to live in and have a character of its own.
The rules
In the city of Madrid this is set by Ordinance 6/2022 on Planning Licences and Responsible Declarations (Ordenanza de Licencias y Declaraciones Responsables Urbanísticas). If the work needs a full design under the Building Act (Ley de Ordenación de la Edificación, LOE), it needs a licencia de obra (building permit) (Article 34 and Annex I.1 of the ordinance). The LOE requires a design when a renovation substantially changes the exterior composition, the volume, the structure as a whole or the use of the building (Article 2.2).
Some small works also need a permit:
Any other works on a home that must be notified to the council go through a declaración responsable (declaration of compliance) (Article 26 and Annex II). Work can start as soon as the declaration is registered with all the documents, although the council may check it afterwards (Article 28). For a permit, the ordinance gives the council up to three months to decide (Article 42.2). That is the legal deadline, and we cannot guarantee it will be met.
Before you start, we tell you which one applies. If it is a declaration of compliance, we prepare it with the technical documents required by Annex II. We compare what you pay in our guide to the construction tax (ICIO) and the building permit.
Sources consulted on 9 November 2026: Madrid City Council Ordinance 6/2022 of 26 April (BOCM no. 116, 17 May 2022) · Ley 38/1999 de Ordenación de la Edificación, Article 2.2 (BOE).
We explain it in detail in declaration of compliance for works in Madrid.
How we work
Step 1
We see the home with you and you tell us what you want to change.
Step 2
For a flat, the design is usually ready in 2 to 4 weeks. For a detached house, it depends on the scope.
Step 3
We submit the design or the declaration of compliance to the town hall.
Step 4
Carried out by the builder that best suits your renovation, chosen with you; interior design by Monfrank Deco.
Frequently asked questions
Can’t see your question? Write to us and we will reply the same day.
Ask on WhatsAppIf the renovation affects the structure, the façade, the volume or the use, yes: it needs a design and a building permit. For an interior renovation that leaves the structure alone, a declaration of compliance may be enough, although a well-prepared design helps avoid surprises on site.
It depends on the floor area and the scope. We give you a fixed price after seeing the home. What affects the price.
For a flat, 2 to 4 weeks. For a detached house, it depends on what is being renovated. The permit timescale depends on the town hall.
The builder that best suits your renovation. We ask for quotes based on the same design and help you choose. Interior design is by Monfrank Deco, our sister interior design studio.
We handle it in the same design. See house extensions.
Yes: we check whether the planning rules allow it and prepare the design for the permit. Change of use from commercial premises to a home (in Spanish). If the homes then need to be registered separately, see horizontal division (in Spanish).
Yes: flats, detached houses and homes, in the Madrid region and on the Costa del Sol (Málaga).
Where we work most
We take on this kind of work in the Madrid region and in the province of Málaga (Marbella and the Costa del Sol).
Let’s talk
Tell us about your project. Call or write to us and we will give you an initial assessment, with no obligation.